Heavy-duty epoxy resin flooring installation across a 3,200 sq m distribution warehouse to handle forklift traffic, chemical exposure, and daily wear.

The Challenge

The existing industrial concrete floor was dusting heavily and becoming a health and safety risk under forklift and pallet-truck traffic. The operation runs 24/7 so downtime had to be minimised.

Our Solution

We applied a high-build epoxy resin system with anti-slip aggregate in the loading bays and a smooth high-gloss finish in the storage racking areas. The system was installed in weekend phases with full curing accelerated using heaters.

The Outcome

Dust generation dropped to zero, forklift tyre wear decreased measurably, and the warehouse passed its next food-grade audit with flying colours. The client has already asked us to quote their second facility.

“We could not afford downtime but needed a proper fix. The weekend phasing was flawless and the floor is bulletproof now. Highly recommended.”

T. Brennan

Operations Director, Hertfordshire Logistics Ltd

Tags:Epoxy ResinAnti-Slip24/7 Phasing3,200 sq m

Ready to Start Your Project?

Whether it is a single classroom or a 3,000 sq m warehouse, we bring the same precision and care to every flooring installation across Hertfordshire.

Request a Free Quote
Get a Free Quote